The Big G was officially unveiled on Friday 30th May by Glasgow City Council leader Gordon Matheson and Chief Executive of Glasgow 2014 David Grevemberg. Evolve were responsible for the structural design and production of over 50 fabrication drawings, which allowed the Big G to be manufactured from what started life as sheets of 5mm flat plate.